Kleen Energy Sys., LLC v. Comm’r of Energy & Envtl. Prot.

by
Kleen Energy Systems, LLC, an electric generating facility, entered into a contract with Connecticut Light and Power Company, an electric distribution company. A dispute subsequently arose concerning the proper interpretation of the contract’s pricing provision. At the request of Waterside Power, LLC, which had entered into a similar contract with Connecticut Light and Power, the Commissioner of Energy and Environmental Protection, acting through the Public Utilities Regulatory Authority (the Authority), conducted proceedings to resolve the dispute. Kleen Energy was a participant in, but not a party to, those proceedings. Waterside subsequently filed a petition for a declaratory ruling challenging the decision. The Authority issued a declaratory ruling denying Waterside relief. Kleen Energy filed an administrative appeal from the Authority’s ruling, claiming that it had a contractual right to submit the dispute to arbitration and that the Authority lacked jurisdiction to issue a declaratory ruling to resolve the dispute. The trial court ultimately concluded (1) the Authority had jurisdiction to issue a declaratory ruling to resolve the dispute, (2) Kleen Energy had waived its contractual right to arbitration, and (3) the Authority had properly resolved the dispute. The Supreme Court reversed, holding that the trial court erred in determining that the Authority had jurisdiction to resolve the pricing dispute. View "Kleen Energy Sys., LLC v. Comm’r of Energy & Envtl. Prot." on Justia Law